Arrowheads
Displaying 1 - 7 of 7
ID | Site | Weight (g) | Functional length (mm) | Functional width (mm) | ToCSA (mm2) | ToCSP (mm) |
---|---|---|---|---|---|---|
CEZ_F1B_141508 | Blučina - Cezavy | 12.30 | 8.62 | 26.26 | 27.36 | |
CEZ_F48_1938 | Blučina - Cezavy | 12.55 | 39.25 | 29.53 | ||
CEZ_F56B_4279 | Blučina - Cezavy | 0.40 | 12.04 | 7.48 | 58.58 | 36.23 |
CEZ_FK_166789 | Blučina - Cezavy | 15.33 | 11.54 | 34.42 | 28.90 | |
SAN_F05_01 | Santovka Travertínový lom III | 0.84 | 12.70 | 8.45 | 45.63 | 32.76 |
SAN_F43_01 | Santovka Travertínový lom III | 1.31 | 11.49 | 8.62 | 34.52 | 29.95 |
TVR_F502_01 | Tvrdonice - Pole od Týnecka | 15.57 | 11.62 | 41.72 | 49.52 |